Friday, May 5, 2023
Week 8 - Purchasing Component Based on The Proposal Requirement
Friday, April 21, 2023
Week 7 - Proposal Presentation of Mini Cleaning Robot
Friday, April 14, 2023
Week 6 - Proposal Presentation Preparation
Saturday, April 8, 2023
Week 5 - Making Context Diagram and Block Diagram of Mini Cleaning Robot
The battery life indicator system monitors the remaining battery voltage and percentage readings in real-time, both during charging and discharging states. Users can view the battery level through various displays such as LED indicators, an OLED display, and the Blynk IoT platform. The Blynk platform also provides an alert system that notifies users when the battery is running low and requires recharging. Hardware components for the battery life indicator system include a rechargeable battery, battery charger module, OLED display, LED indicator, voltage regulator, and voltage divider circuit.
The NodeMCU ESP32 acts as the central control unit, coordinating the operation of both the movement and battery indicator systems. Power consumption affects the battery life indicator system when the movement system is activated. If the battery reaches a low state, Blynk sends a notification alert to the user, indicating that the battery needs to be recharged before the movement system can resume operation.
Friday, March 31, 2023
Week 4 - Introduction of Capella Software, Produce Context Diagram of The Mini Cleaning Robot, and Swapping Function with Other Group
This week, my lecturer, Sir Zaki, gave a briefing on introducing Capella software and a tutorial on how to use it. This session covers four main steps: installation, workspace, user interface, and a new Capella project. At the same time, he also gave a briefing on the work breakdown structure (WBS), which is very important to ensure the production of projects with complex systems runs smoothly. After that, my lecturer suggested swapping systems from each group with other groups because some systems were not fully functional without the other systems. For example, vacuum and mop systems cannot be separated, and existing cleaning products certainly have both systems on the market. After discussing how to swap the system with other groups, our group now has a new system: the battery indicator system, which has been replaced with the previous system, the air filter system. All systems swapping with other groups are listed in a context diagram to show each system included in the Mini Cleaning Robot.
Friday, March 24, 2023
Week 3 - Continue Discussion on 'Mini Cleaning Robot' Assessment and Flow Chart Exercise
Friday, March 17, 2023
Week 2 - Project Assessment Introduction and Function Discussion
During this week, the title selection for the project assignment that will be produced for each group was discussed and finalized: "Mini Cleaning Robot" for this semester. Therefore, I formed a group with my classmate Qamarul and established the group name QS. Back to the project assignment: each group was given a robot project that had been produced last semester and had to innovate by adding cleaning features and different systems. To make it easier for all parties, my group and others held a brainstorming session to discuss ideas for adding system features to the robot. As a result of the discussion session, our group decided to produce a movement system that includes autonomous and manual control and add an air filter system as a cleaning feature. Also, my lecturer, Sir Zaki, shared some lessons from Chapter 1 of the book System Engineering For Dummies this week.
Week 15 - Final Report, Slide Presentation & Progress Report Submission
In the final week, our group was assigned to complete the final report for the System Engineering subject after last week's final presen...
-
In this first week, we were given a briefing on the course learning outcomes (CLO) for the System Engineering subject covered by my lecturer...